13. A gren infrastructure to urban areas along the reservoir: The case of Itá(SC) / Uma infraestrutura verde para áreas em urbanização junto a reservatórios: O caso de Itá (SC)
The changes in the landscape and environment and socio-spatial relations in areas affected by the implementation of Power Plants in the Uruguay river watershed creates an opportunity for research on the implementation of a Green Infrastructure for areas along the reservoir, as a fundamental aspect in the study and proposing models of multifunctional landscap
Publicado em: 2010
-
14. Rock mass characterization of Morro Grande PCH using the RMR system / Compartimentação de maciços rochosos para projetos básicos de PCH´s usando o sistema RMR: aplicação no projeto básico da PCH Morro Grande - RS
The opening of the electric production sector in Brazil causes an increase amount of Small Hydroelectric Power Station - PCHs - project. The necessaries geological-geotechnical studies for this kind of construction had to be adapted to this new sector necessity, without quality losses. This research aim was the improvement of the geological-geotechnical stud
Publicado em: 2009
-
15. Sustentabilidade de barragens e o planejamento de hidreletricas na Bolivia / Sustainability of dams and hydroelectric plants planning in Bolivia
The construction of dams has been one important option that was used by many countries in order to reach the development. With elapsing of the years the dams has evidence that produce many benefits but also impacts, that s why must be a balance in the choice and determination of the new projects in function of the needs and always with the goal of reach the
Publicado em: 2008
-
16. Contra as invasões barbaras, a humanidade : a luta dos Arara (Karo) e dos Gavião (Ikoloehj) contra os projetos hidreletricos do Rio Machado, em Rondonia / Against the barbarian invasions, humanity : Arara (Karo) and Gavião (Ikoloehj) indigenous people agaist hydroelectric projects of Machado s River, in Rondonia, Brazil
The dissertation deals with the struggle of Arara (Karo) and the Gavião (Ikólóéhj) indigenous people against hydroelectric projects of Machado s River, in Rondônia, Brazil. This mobilization was initiated in the 80 s against the project of Usina Ji-Paraná, suspended in 1993, and remains until the present day, with the resumption of the project of Usina
Publicado em: 2008
-
17. Evaluation of the hydraulic potential in hydrographic basins by using the geographical information systems / Avaliação do potencial hidráulico em bacias hidrográficas por meio de Sistemas de Informações Geográficas
The hydroelectric resources in the Country, either in terms of the capacity already installed and its potential still unexplored rather represent greatly strategic and economically important assets. In generation of the decentralized electric power, the hydroelectric minicentrals (MCHs) are distinguished within an environmental management and preservation co
Publicado em: 2007
-
18. Reação álcali-agregado nas usinas hidrelétricas do Complexo Paulo Afonso/CHESF: influência da reação nas propriedades do concreto. / Alkali-aggregate reaction at the Paulo Afonso Hydreletric Complex/CHESF: influence of the reaction in the properties of the concrete.
Several are the concrete deterioration processes and the alkali-aggregate reaction (AAR) is classified as a chemical deterioration process. As a reaction result and in an umid environment expansion products are formed, being able to cause cracking, loss of strength, increase of deformation, loss of functionality, reduction of the durability of the structure,
Publicado em: 2007
-
19. CARACTERIZAÇÃO E AVALIAÇÃO DE IMPREVISTOS GEOLÓGICOS EM OBRAS DE PEQUENAS CENTRAIS HIDRELÉTRICAS (PCHs)
The construction of a hydroelectric undertaking requires wise combination formed by several technical and nontechnical aspects of different nature but, by all means, the local geological- geotechnical characteristics are of fundamental importance for a suitable quality control of works, guaranty of undertakings security, reductions of costs and risks related
Publicado em: 2006
-
20. Brasil-Paraguai : marcos da política pragmática na reaproximação bilateral, 1954-1973: um estudo de caso sobre o papel de Stroessner e a importância de Itaipu
This paper aims to analyze the process of political rapprochement between Brazil and Paraguay that took place from 1954 to 1973. It is defended that those years are to be considered as essential marks of this bilateral relationship: in 1954, general Alfredo Stroessner takes over the power in Paraguay, and founds a dictatorship based on the tripod Government
Publicado em: 2006
-
21. Modelo de suporte a decisão para o otimização da operação de sistema de usinas hidroeletricas / A decision support tool for the optimization of the operation of a system of hydro-eletric plants
This dissertation has the objective of build a Decision Support Tool that gives a quick and easy way to analyze all the different alternatives to manage integrated a complex of hydroelectric reservoirs seeking the maximization of the benefits of the complex. The benefits of the complex were defined as the total potential gravitational energy of the hydraulic
Publicado em: 2006
-
22. Modelo de suporte a decisão para o otimização da operação de sistema de usinas hidroeletricas / A decision support tool for the optimization of the operation of a system of hydro-eletric plants
This dissertation has the objective of build a Decision Support Tool that gives a quick and easy way to analyze all the different alternatives to manage integrated a complex of hydroelectric reservoirs seeking the maximization of the benefits of the complex. The benefits of the complex were defined as the total potential gravitational energy of the hydraulic
Publicado em: 2006
-
23. Cost and energy evaluations in grain elevator units / Avaliação energética e de custo em unidades armazenadoras
The agroindustry sector has an important role in Brazilian economy. In 2004, the exports of the agrobusiness corresponded to 40.4% of the total Brazilian export, as totaling US$ 96.475 billion. The lack of investments in the energy sector, that caused electric power rationing for a period of one year from June 2001, associated to the seasonableness of the re
Publicado em: 2006
-
24. Modelo multicritérios de apoio à decisão aplicado ao uso múltiplo de reservatórios : estudo da barragem do ribeirão João Leite
This research develop a Decision Analysis model to support the decision makers in the choice process of the policies, programs and projects related to multiple use of water resources, and more specifically, related to multiple use of reservoirs. For this, a case study is carried through where, with the utilization of the Analytic Hierarchy Process (AHP) meth
Publicado em: 2006