Earned Value
Mostrando 1-12 de 18 artigos, teses e dissertações.
-
1. An application of Earned Value Management (EVM) with Monte Carlo simulation in engineering project management
Resumo As rápidas alterações no mercado, faz que as empresas, cada vez mais, se orientem através de estruturas de projetos. Assim, um projeto difere de uma atividade rotineira pois é único, sendo gerenciado, e proporcionando benefícios esperados sem custos maiores que o previsto. Logo, deve-se planejá-lo e controlá-lo identificando os desvios entre
Gest. Prod.. Publicado em: 08/08/2019
-
2. MAKING A CAREER IN A MALE-DOMINATED FIELD: THE MEANING OF WORK FOR WOMEN EMPLOYED IN THE FINANCIAL MARKETS
ABSTRACT Purpose: This paper aims to analyze the subjective aspects of women who work in the financial market, focusing on the meanings they attribute to their labour activities. Originality/value: Despite the significant academic production about gender, few studies investigate the meaning women attribute to their work activities or analyze the main build
RAM, Rev. Adm. Mackenzie. Publicado em: 2017-08
-
3. Estudo comparativo entre as práticas empresariais e a teoria de gerenciamento por Valor Agregado: o caso da construção civil
O monitoramento do desempenho de projetos por meio de indicadores é um recurso de gestão de grande importância para as organizações, sendo o Earned Value Management (EVM) amplamente utilizado há aproximadamente 40 anos. Entretanto, há poucas pesquisas sobre sua utilização na indústria da construção civil. Outrossim, alguns autores argumentam quea
Ambient. constr.. Publicado em: 2015-09
-
4. Comparison of carbon sequestration potential in agricultural and afforestation farming systems
In the last few decades, many forests have been cut down to make room for cultivation and to increase food or energy crops production in developing countries. In this study, carbon sequestration and wood production were evaluated on afforested farms by integrating the Gaussian diameter distribution model and exponential diameter-height model derived from sam
Sci. agric. (Piracicaba, Braz.). Publicado em: 2013-04
-
5. UMA ABORDAGEM OTIMIZADA PARA O PROBLEMA DE ALOCAÇÃO DE EQUIPES E ESCALONAMENTO DE TAREFAS PARA A OBTENÇÃO DE CRONOGRAMAS EFICIENTES / AN OPTIMIZED APPROACH TO THE PROBLEM ALLOCATION OF TEAMS AND SCALING OF TASKS FOR OBTAINING schedules EFFICIENT
In software development, as well as any other activity of a wide range of engineering, an effective project planning is essential. Failures in planning or poor planning can cause delays and costs that, given time and budget constraints, are often unacceptable, leading to critical failures in business. One of the main activities of project planning is the pla
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 05/08/2011
-
6. Earned Schedule : uma extensão à análise de valor agregado
A frequente necessidade de adaptação dos sistemas empresariais, em um ambiente de incertezas cada vez maiores decorrente do constante aumento da competitividade faz com o gerenciamento de projetos ganhe cada vez mais espaço nas organizações. Uma das ferramentas mais utilizadas para o acompanhamento e controle de projetos é a análise de valor agregado,
Publicado em: 2010
-
7. SistemÃtica para controle e acompanhamento de projetos na construÃÃo civil
This paper, presents a project management control implantation in civil construction using resources of a enterprise ressource planing system solution bought in the Brazilian marquet. Allied to a management system, is showed a group of rules and procedures to classificate the informations that can possible to project management and his team, identify in adva
Publicado em: 2009
-
8. JustificaÃÃo de investimentos em tecnologias avanÃadas de manufatura: um framework para a avaliaÃÃo da opÃÃo de esperar, sob a Ãtica das opÃÃes reais
Evaluating capital investment projects for the adoption of advanced manufacturing technologies (AMT) is a critical task faced by manufacturing managers. Due to the normally high levels of risk and uncertainty involved, the traditional investment appraisal techniques are often insufficient and must be complemented by sophisticated evaluation methods. Since th
Publicado em: 2009
-
9. Avaliação de desempenho em projetos complexos: uma abordagem multidimensional. / Complex project performance evaluation: a multidimensional approach.
This dissertation presents a study of project performance evaluation through the development of a multidimensional model that integrates the dimensions of cost, schedule and quality of the project end product. The foundation for the development of this multidimensional approach is a model that integrates the Earned Value Management (EVM) concept with Systems
Publicado em: 2009
-
10. Aspectos da germinação de sementes, da emergência de plântulas e da morfologia dos frutos e sementes de Campomanesia pubescens (DC.) O. Berg (myrtaceae)
Campomanesia pubescens (D.C.) O. Berg., found in Minas Gerais, Goias and the Espirito Santo to Rio Grande do Sul, is a fruitful Myrtaceae whose gender has 25 species distributed from Mexico to Argentina and 15 of them natives of Brazil. Their seeds need of technical and scientific studies that could clarify their ecological characteristics, morphological and
Publicado em: 2008
-
11. Regime imunitório das instituições de educação e assistência social IPTU
This work is aimed at reviewing the tributary patrimony immunity of care institutions for real estate of their property under a leasing arrangement, if not through confrontation or apply to existing legislation, with the evolution of case law and emerging interpretative trends not given only by the recent trial, overviews, but also marked out in the view of
Publicado em: 2008
-
12. Aplicação do earned value em projetos complexos - um estudo de caso na EMBRAER
O gerenciamento do Earned Value vem obtendo aceitação crescente nas empresas e entre profissionais tais como gerentes de projetos e funcionais, devido à sua efetividade no controle dos resultados do projeto. Earned Value é definido como uma ferramenta de controle que permite avaliar simultaneamente de maneira quantitativa como se encontram os custos e pr
Gestão & Produção. Publicado em: 2007-12