Project Manager
Mostrando 1-12 de 75 artigos, teses e dissertações.
-
1. Concepção e ensino do esporte no Programa Inspiração Internacional: compreensão e ações pedagógicas
Resumo Objetivamos analisar a concepção e o ensino do esporte presentes no Programa Inspiração Internacional em escolas públicas no Estado de Pernambuco. Fizemos uma pesquisa qualitativo-descritiva com base na hermenêutica dialética e caracterizada como bibliográfico-documental com inserção no campo, por meio de entrevista semiestruturada com profe
Rev. Bras. Ciênc. Esporte. Publicado em: 13/12/2019
-
2. Towards Classifying Sociocultural Aspects in Global Software Development
ABSTRACT The geographical, temporal distances and socio-cultural differences are the biggest challenges for Global Software Development (GSD). In GSD, it is necessary to deal with behaviors, values and skills of the team members, conflicts, rework, delays, etc. can influence a software production process. The objective of this paper is to identify the socioc
JISTEM J.Inf.Syst. Technol. Manag.. Publicado em: 18/10/2018
-
3. The Preface as Stage: the Theatrical Trope and the Performance of Authorial Identities in The Nineteenth Century
Abstract This essay explores references to the theatre in prefaces by Charles Dickens, Nathaniel Hawthorne, and Henry James. Particular emphasis is given to the way these authors employ figures such as stage manager and dramatist to reach their audiences and project authorial images. The figures in question are historicized and discussed in light of the conc
Ilha Desterro. Publicado em: 2017-04
-
4. A decision model for energy companies that sorts projects, classifies the project manager and recommends the final match between project and project manager
Abstract This study presents an integrated model to support the process of classifying projects and selecting project managers for these projects in accordance with their characteristics and skills using a multiple criteria decision aid (MCDA) approach. Such criteria are often conflicting. The model also supports the process of allocating project managers to
Prod.. Publicado em: 24/11/2015
-
5. Aerospace Vehicle Development Applications of Atmospheric Thermodynamic Inputs
ABSTRACT: Aerospace engineering has always had the need for various natural environment parameters to be used as inputs in research and engineering analyses used in the design and development of aircraft and launch/reentry vehicles. Although winds are indeed the main natural environment parameter used as inputs in vehicle design, the thermodynamic atmospheri
J. Aerosp. Technol. Manag.. Publicado em: 2014-03
-
6. Uma aplicação de redes definidas por software para a gerência de redes de datacenters virtualizados
Cloud-Computing services related to infrastructure have been drawing much attention recently. On this business model, virtualization is an efficient way to ofier flexibility, isolation and several new functionalities. This technology has led to the multi-tenant datacenter model for Cloud-Computing, where the client (tenant) can rent not only a virtual machin
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 31/07/2012
-
7. Constitucionalismo e profecia em Roberto Campos : o liberal e o liberalismo na constituição de 1988
The work aims to analyze the influence degree of political thought and ideas advocated by Roberto Campos during the constitutional reform in 1988 as a Senator, economist and advocate of economic liberalism. To do so, we will examine his manifestations about the theme, the political and economic predictions contained in their articles published in countless n
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 21/12/2011
-
8. UMA ABORDAGEM OTIMIZADA PARA O PROBLEMA DE ALOCAÇÃO DE EQUIPES E ESCALONAMENTO DE TAREFAS PARA A OBTENÇÃO DE CRONOGRAMAS EFICIENTES / AN OPTIMIZED APPROACH TO THE PROBLEM ALLOCATION OF TEAMS AND SCALING OF TASKS FOR OBTAINING schedules EFFICIENT
In software development, as well as any other activity of a wide range of engineering, an effective project planning is essential. Failures in planning or poor planning can cause delays and costs that, given time and budget constraints, are often unacceptable, leading to critical failures in business. One of the main activities of project planning is the pla
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 05/08/2011
-
9. The Influence of the Project Management Office on Developing the Competences of the Project Manager / A influência do escritório de gerenciamento de projetos no desenvolvimento de competências do gerente de projetos
Escritórios de Gerenciamento de Projetos (EGPs) possuem um amplo espectro de serviços (HOBBS; AUBRY, 2007). Nesta pesquisa, foram investigados os serviços dos EGPs direcionados aos gerentes de projetos, particularmente, aqueles destinados a fortalecer as competências. Delimitou-se essa investigação a escritórios maduros. Há recomendações anteriores
Publicado em: 2011
-
10. Um modelo de simulador para ambientes de desenvolvimento de processos de software utilizando a análise da sensibilidade
The construction of a software involves high degree of risk and requires of the manager a lot of planning to attend the budget estimates and meet deadlines. In the context of software processes, there are limited technological resources that allow the extract of knowledge of the processes modeled in PSEEs and indicate what factors cause the greatest impact o
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 2011
-
11. Análise qualitativa de riscos de projetos suportada pela teoria dos jogos / Project risk assessment supported by game theory
Since 1944, when it was published the first book by John Von Neumann about Game Theory, the application field is growing very fast year after year. At the begin the theory was widely used to predict Macroeconomics behavior but nowadays there are several studies in different areas as biology, sociology and computational engineering. John Maynard Smith in the
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 14/12/2010
-
12. ESTIMATIVA DE CONSUMO PARA RECUPERAÇÃO DE PERDAS NÃO-TÉCNICAS DE ENERGIA ELÉTRICA METODOLOGIA PARA DETERMINAÇÃO DE FATORES DE CARGA E DE DEMANDA TÍPICOS DE ATIVIDADES COMERCIAIS / ESTIMATE OF CONSUMPTION FOR RECOVERY Non-technical losses of electricity - METHODOLOGY FOR DETERMINING FACTOR LOADING AND DEMAND TYPICAL ACTIVITIES COMMERCIAL
This dissertation presents a research methodology for estimating the energy consumption of commercial consumer units of COELBA, for recovery of nontechnical energy loss by determination of typical load factors and demand factors of similar consumers. The results expect to improve consumer relations between company and consumer of electricity. The development
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 09/04/2010