1. Multi-stage dumping sequence - a feasible waste management alternative for open pit mining
Abstract Waste management and environmental aspects are progressively gathering attention in the mining industry. Mine planners must deal with increasingly complex tasks to balance between ore block schedules, waste disposal, operational cost and environmental reclamation. The mine incomes are generally related to mining and processing of the ore, thus most
REM, Int. Eng. J.. Publicado em: 2021-06
-
2. A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
Abstract A significant cost in the operating budget of most mining operations arises from purchasing and maintaining haulage trucks. Recently, in-pit crushing and conveying (IPCC) has been subject to research because of its potential to reduce haulage costs. The objective of this study is to identify early on in a project, by means of a decision-making metho
REM, Int. Eng. J.. Publicado em: 2019-06
-
3. Map of the potential geotechnical susceptibility for operational pit slopes
Abstract This article proposes a procedure to elaborate a map that presents the potential risk of failure occurrence in the operational slopes of open pit mines. First, it is necessary to collect the available geological-geotechnical data and perform a field mapping, in order to verify and validate the most representative parameters and to characterize the d
REM, Int. Eng. J.. Publicado em: 2019-03
-
4. Using UAV for automatic lithological classification of open pit mining front
Abstract Mine planning is dependent on the natural lithologic features and on the definition of their limits. The geological model is constantly updated during the life of the mine, based on all the information collected so far, plus the knowledge developed from the exploration stage up to the mine closure. As the mine progresses, the amount of available dat
REM, Int. Eng. J.. Publicado em: 2019-03
-
5. The impact of haulroad geometric parameters on open pit mine strip ratio
Abstract The aim of the study was to analyze the impact on the strip ratio (SR) through varying haul road geometric parameters in two types of deposits, namely one with a steeper dip and a second one with a more equidimensional horizontal behavior. The SRs and the overall slope angle were compared with a base scenario, where the results show an increase in t
REM, Int. Eng. J.. Publicado em: 2019-03
-
6. The impact of payload truck factor use in mine performance reports for an open pit copper mine in Brazil
Abstract This article aims to evaluate the use of a truck factor for off-highway trucks in open pit mine operations, thus reducing error on material movement and mine production data entry. This method is current for a copper mine located in South East Pará, Brazil. With a dispatch system, the truck factor is calculated using three data inputs called measur
REM, Int. Eng. J.. Publicado em: 2018-07
-
7. Classical and stochastic mine planning techniques, state of the art and trends
Abstract Determination of the best possible ultimate pit for an open pit mine is a fundamental subject that has undergone a highly evolutionary process, reviewed in this study, since the correct choice carries substantial economic impact for the industry. The correct choice can be very beneficial for project analysis, whereas an incorrect choice has the pote
REM, Int. Eng. J.. Publicado em: 2018-04
-
8. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project
Abstract Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling
REM, Int. Eng. J.. Publicado em: 2018-04
-
9. Contamination and Soil Biological Properties in the Serra Pelada Mine - Amazonia, Brazil
ABSTRACT Discovered in 1980 and unleashed an utter gold rush of the modern era, Serra Pelada was the largest open-air mine in Brazil. About 80,000 gold prospectors worked there until 1984, when the gold pits were flooded. The environmental impact caused by mining inflicted irreversible damage to the ecosystem, with the formation of a large lake and piles of
Rev. Bras. Ciênc. Solo. Publicado em: 15/02/2018
-
10. First record of Heteropsylla caldwelli Burckhardt (Hemiptera: Psyllidae) from Brazil and its population dynamics on earpod tree in Rio Grande do Sul
Abstract Heteropsylla caldwelli Burckhardt (Psyllidae, Ciriacreminae) is reported for the first time from Brazil (States of Minas Gerais, Paraná, Rio Grande do Sul) from Enterolobium contortisiliquum (Vell.) Morong. The earpod tree, from Albizia edwallii (Hoehne) Barneby and J.W. Grimes and Senegalia polyphylla (DC.) Britton (Fabaceae, Mimosoideae), all pre
Rev. Bras. entomol.. Publicado em: 2017-12
-
11. Quantifying dilution caused by execution efficiency
Abstract In open pit mining, dilution is not always a factor systematically analyzed and calculated. Often it is only an adjusted number, for example, calculated or even empirically determined for a certain operational condition perpetuating along time in the form of a constant applied to calculating reserves or mine planning in attendance of audit requireme
REM, Int. Eng. J.. Publicado em: 2016-12
-
12. Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"
Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carr
Rem: Rev. Esc. Minas. Publicado em: 2015-09