1. Short-term mine scheduling targeting stationary grades
Abstract In short-term mine planning, mining scheduling is generally defined by designing dig-lines, allocated on benches. The mined ore will be sent to stockpiles, homogenization piles, or a concentration plant. The process to design dig-lines is usually done manually, whereby multiple simultaneous mining fronts are time-consuming and labour-intensive. The
REM - International Engineering Journal. Publicado em: 2022
-
2. Influence of water level in mine sequencing applied to strategic mining planning
Abstract Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of
REM, Int. Eng. J.. Publicado em: 2020-06
-
3. Direct sequencing of blocks in stochastic models with multi-mines and multi-destinations
Abstract Mining Scheduling is the one that maximizes profit from mining over time. By means of computational methods, the deposit is discretized in blocks and algorithms are used to consummate this objective. The methods that are widely known nowadays for mining scheduling optimization of a discrete block model were based on graph theory, and among those mos
REM, Int. Eng. J.. Publicado em: 16/09/2019
-
4. Grade uncertainty embedded in long term scheduling: stochastic mine planning
Abstract The inclusion of grade uncertainty for multivariate mineral deposits is of great importance for the correct management of subsequent decisions involved in mining planning. Mapping grade uncertainties allows maximization of profit and resource extraction. In this article, the co-simulation turning band algorithm is applied with the aim of predicting
REM, Int. Eng. J.. Publicado em: 2019-06
-
5. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project
Abstract Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling
REM, Int. Eng. J.. Publicado em: 2018-04
-
6. Direct block scheduling technology: Analysis of Avidity
Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology) which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the
REM, Int. Eng. J.. Publicado em: 2018-03
-
7. Impacto de diferentes algoritmos e geometria de depósitos minerais no planejamento de longo prazo
The main objective of mine planning is to determine ore quantity and quality distribution along a time sequence, i.e., scheduling the ore necessary to make the project technically and economic viable. These temporal sequences are fundamental for the financial success of a mine activity and presently this optimal sequence can be obtained through various minin
IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia. Publicado em: 2012
-
8. Estratégia ambiental pró-ativa: sequenciamento de lavra concomitante com a disposição de estéril dentro da mina. / Proactive environmental strategy: mine sequence concomitant with in pit waste dumping.
Este trabalho propõe uma metodologia inovadora de seqüenciamento de lavra em minério de ferro a qual, além de considerar os parâmetros operacionais e econômicos das técnicas tradicionais, permite uma abordagem ambiental proativa para sequenciar a lavra de forma a antecipar a exaustão de parte da cava para disposição do estéril dentro da cava final
Publicado em: 2009
-
9. Metodologia de planejamento estratégico de lavra incorporando riscos e incertezas para a obtenção de resultados operacionais. / Strategical minnig planning methodology incorporating risks and uncertanties to obtain operational results.
Strategic mine planning corresponds to the process to determine the best mine design and scheduling according to a previously stablished strategy. It is considered as a key element for the success of a mining venture, once supports the decision process related to it conduct and development. Conventional strategic mine planning methods are based on determinis
Publicado em: 2008