Civil Engineer
Mostrando 13-22 de 22 artigos, teses e dissertações.
-
13. A implantação de uma modernidade : o processo de verticalização da area central de Campinas / The introduce from a modernity : the process through the vertical development in the downtown area of Campinas
In the beginning of the XX century political and administrative efforts were made with the intention of change the image and the urban characteristics of Campinas, in the state of São Paulo. One of the means by the image of modernization on the city was the ?Plan of Urban Development,? created by engineer and architect Francisco Prestes Maia in the first ha
Publicado em: 2007
-
14. A implantação de uma modernidade : o processo de verticalização da area central de Campinas / The introduce from a modernity : the process through the vertical development in the downtown area of Campinas
In the beginning of the XX century political and administrative efforts were made with the intention of change the image and the urban characteristics of Campinas, in the state of São Paulo. One of the means by the image of modernization on the city was the ?Plan of Urban Development,? created by engineer and architect Francisco Prestes Maia in the first ha
Publicado em: 2007
-
15. Estudo laboratorial dos danos causados pelo broqueamento e retificaÃÃo em corpos-de-prova testemunhos
It is normal in engineer practice to use core testing to determine the inplace compressive strength of concrete in a structure. Generally, cores are obtained to: Asses whether suspect concrete in a new structure complies with strength-based acceptance criteria; or determine in-place concrete strengths in an existing structure for the evaluation of structural
Publicado em: 2006
-
16. Modelo de acompanhamento de obras baseado em indicadores
Building and construction companies, mainly small and mid size ones, make a poor use of management tools available in the market. Without adequate information, the field engineer relies solely upon his own experience in order to deal with managerial issues related to the construction of a given site. Management skills in the building and construction industr
Publicado em: 2005
-
17. Methodology for evaluation of dam safety / Metodologia para avaliação da segurança de barragens
As barragens são geralmente obras associadas a um elevado potencial de risco devido à possibilidade de ruptura, com conseqüências catastróficas para as próprias estruturas, para o meio ambiente, com destruição de flora e fauna, e principalmente pelas perdas de vidas humanas e econômicas. Este trabalho tem por objetivo propor e validar uma metodologi
Publicado em: 2005
-
18. Metodologia para avaliação da segurança de barragens / Methodology for evaluation of dam safety
Dams are structures generally associated to high potential risks due to the possibility of their failure, which could bring catastrophic consequences to the structures themselves, to the enrivonment by destructing the flora and fauna and, mainly, because they could cause economical and life losses. The purpose of this work is to propose and validate an alter
Publicado em: 2005
-
19. Analysis of new procedure for the structural design of buried concrete pipe / Análise de novo procedimento para o projeto estrutural de tubos de concreto enterrados
O procedimento usual no Brasil para o projeto de tubos de concreto enterrados é o procedimento de Marston-Spangler. Este trabalho avalia o comportamento deste procedimento com o procedimento padrão recomendado pela ASCE (American Society of Civil Engineer), denominado de SIDD (Standard Practice for Direct Design of Buried Precast Concrete Pipe Using Standa
Publicado em: 2005
-
20. Pensando o ensino do futuro com perspectivas humanizadoras : a engenharia civil como pretexto
In this work, we study the academic profession in the civil engineering schools scertified to delineate perspectives going beyond the civil engineering itself, trying to enhance how to articulate the aspects of a humanistic, social and holistic view in the strutural models of these schools, so that the formation of naw profassionals (who may become future ac
Publicado em: 2002
-
21. Avaliação do desempenho termico de uma residencia na região central de Campinas
The present work was developed under the engineer s point of view, who wish to evaluate the thermal performance of a building and to join the several elements to improve thermal cornfort in future buildings. A literature research was carried out to find the methods and tool for this evaluation. One of these tools was the Energy Simulation Softwares. To have
Publicado em: 1999
-
22. Fase basica do plano diretor de drenagem para a cidade de Campinas
: Campinas City shows several points of inundation because many areas destined to overflow are ocupied by man. The form to avoid that new critic points appears and to eliminated the present points is to make a drainage management plan (DMP). The DMP is a correct and preventive planning process and it has three parts: basic, pratice and executive. The objecti
Publicado em: 1993