Estruturação e implantação de um processo de melhoria continua baseada em gestão a vista : uma aplicação em um setor de usinagem : Priscilla de Barros Basso Pagliuso / Structuring and implementing a vew management based enhancement process: aplication to a machine department
AUTOR(ES)
Florinêz Pugliesi da Silva
DATA DE PUBLICAÇÃO
2004
RESUMO
The Productivity Program was developed in the Schrader Bridigeport Brasil Machine Department, following the production process of "Simplex" Machine Group. It is an "on View Management", once there are worksheets that register, daily, the machine roductivity calculations and stop causes. This program was created with the objetive of improve the brazilian site operations, increase productivity in machine department, through efficiency increase of equipament, reduce the time of stopped machines, the production costs and hours and other lost hours not include in previus itens. This program has a theorethical base in one of the foundations of "TPM - Total Productive Maintence" that is the optimization of equipment efficiency (OEE - Overall Equipament Effectiveness)
ASSUNTO(S)
produtividade qualidade quality manutenção produtiva total total productive maintenance productivity
ACESSO AO ARTIGO
http://libdigi.unicamp.br/document/?code=vtls000363112Documentos Relacionados
- Proposta de melhoria no processo de alocação de serviços submarinos a navios baseada na estruturação de problemas : um estudo de caso na Petrobras
- Proposta para estruturação da gestão da melhoria contínua em uma fabricante de bebidas
- Melhoria contínua continua! : uma análise sob a ótica de capabilities operacionais
- STRUCTURING AND IMPLEMENTATION OF A SOURCING DEPARTMENT: A CASE STUDY IN A SERVICE ORGANIZATION
- Processo de melhoria contínua para o setor nexa da ong Junior Achievement : implementação do ciclo PDCA