UASB reactor startup for the treatment of municipal wastewater followed by advanced oxidation process

The present study was done to shorten the start-up time of up-flow anaerobic sludge blanket (UASB) reactor. Two different nutrients were used during the UASB start-up period, which was designed to decrease the hydraulic retention time (HRT) from 48 to 24 and 12 to 6 hrs at average temperatures of 25-34 ºC. In the first stage, start-up was with glucose for 14 days and then the reactor was also fed with macro- and micronutrients as a synthetic nutrient influent (SNI) from 15 to 45 days as the second stage. For the control, a second reactor was kept on glucose feeding from day 1 to 45. The remov...