Production Scheduling
Mostrando 1-12 de 100 artigos, teses e dissertações.
-
1. Short-term mine scheduling targeting stationary grades
Abstract In short-term mine planning, mining scheduling is generally defined by designing dig-lines, allocated on benches. The mined ore will be sent to stockpiles, homogenization piles, or a concentration plant. The process to design dig-lines is usually done manually, whereby multiple simultaneous mining fronts are time-consuming and labour-intensive. The
REM - International Engineering Journal. Publicado em: 2022
-
2. Influence of water level in mine sequencing applied to strategic mining planning
Abstract Developing mine sequencing involves a number of factors and a large amount of information, and consequently the profitability of the project will strongly depend on the production schedule. A mining project may be conditioned to non-optimal sequencing, which may affect the economic results of the project and also lead to an inadequate utilization of
REM, Int. Eng. J.. Publicado em: 2020-06
-
3. Scheduling optimum planting window for gladiola based on El Niño Southern Oscillation
ABSTRACT: Gladiola is an important cut flower worldwide and scheduling field gladiola production is largely dependent on planting at the correct time since its development is controlled by the air temperature. The aim of this study was to configure a planting window of gladiola in order to harvest spikes to be sold on All Souls' Day and Mother's Day holidays
Sci. agric. (Piracicaba, Braz.). Publicado em: 20/12/2019
-
4. CAPACITATED LOT SIZING AND SCHEDULING WITH ORDER ACCEPTANCE AND DELIVERY TIME WINDOWS: MATHEMATICAL MODEL AND A MIP-BASED HEURISTIC
ABSTRACT This research addresses a lot sizing and scheduling problem inspired by a real-world production environment where the customers make advanced orders and the industry need to decide which orders will be accepted with the aim of maximizing the profit respecting the production capacity constraints. Orders are composed of different types of items which
Pesqui. Oper.. Publicado em: 02/12/2019
-
5. ANALYSIS OF MIXED INTEGER PROGRAMMING FORMULATIONS FOR SINGLE MACHINE SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES AND RELEASE DATES
ABSTRACT The scheduling of jobs over a single machine with sequence dependent setups is a classical problem setting that appears in many practical applications in production planning and logistics. In this work, we analyze six mixed-integer formulation paradigms for this classical context considering release dates and two objective functions: the total weigh
Pesqui. Oper.. Publicado em: 09/05/2019
-
6. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project
Abstract Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling
REM, Int. Eng. J.. Publicado em: 2018-04
-
7. Direct block scheduling technology: Analysis of Avidity
Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology) which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the
REM, Int. Eng. J.. Publicado em: 2018-03
-
8. Research and Applications of Shop Scheduling Based on Genetic Algorithms
ABSTRACT Shop Scheduling is an important factor affecting the efficiency of production, efficient scheduling method and a research and application for optimization technology play an important role for manufacturing enterprises to improve production efficiency, reduce production costs and many other aspects. Existing studies have shown that improved genetic
Braz. arch. biol. technol.. Publicado em: 20/10/2016
-
9. A NEW MATHEMATICAL MODEL FOR THE WORKOVER RIG SCHEDULING PROBLEM
ABSTRACT One of the most important activities in the oil and gas industry is the intervention in wellsfor maintenance services, which is necessary to ensure the constant production of oil. These interventions are carried out by workover rigs. Thus, the Workover Rig Scheduling Problem (WRSP) consists of finding the best schedule to service the wells while con
Pesqui. Oper.. Publicado em: 2016-08
-
10. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION
This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO). PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the
Pesqui. Oper.. Publicado em: 2015-04
-
11. JOINT OPTIMIZATION OF PRODUCTION PLANNING AND VEHICLE ROUTING PROBLEMS: A REVIEW OF EXISTING STRATEGIES
Keen competition and increasingly demanding customers have forced companies to use their resources more efficiently and to integrate production and transportation planning. In the last few years more and more researchers have also focused on this challenging problem by trying to determine the complexity of the individual problems and then developing fast and
Pesqui. Oper.. Publicado em: 2014-08
-
12. A review of three decades of research on some combinatorial optimization problems
This paper presents an overview of our research in combinatorial optimization problems. Over the last three decades, our team has been studying mostly optimization problems that arise in industrial environments through the elaboration and solution of mathematical decision models. In addition to elaborating innovative models, we have improved upon existing so
Pesqui. Oper.. Publicado em: 2013-04