Seleção de locais para barragens de rejeitos usando o método de análise hierárquica. / Solid wastes and water tailing dams site selection using the hierarchy analysis process.

AUTOR(ES)
DATA DE PUBLICAÇÃO

2006

RESUMO

Tailings dams are structures designed to retain solid wastes and water generated in the processing of metal ore. The overall planning of these dams starts with site selection, step in which all directly or indirectly influential variables should be considered: geological, hydrological, topographic, geotechnical, environmental and social characteristics, risk evaluation etc. This work presents a study of the utilization of the hierarchy analysis process (AHP) as a tool for decision-making in the selection of sites for tailings dams. The bibliographic review of relevant factors resulted in the proposal of a list of indicators, which was very useful as an orientation for data collection in the study case, and is considered as an important contribution from this research. The study case consisted in the location of the new copper tailings dam of MINER Inc. in Carmen de Atrato, Colombia. Initially, a geochemical software was applied to the region to discard unsuitable areas. For the selection of a site among three resulting alternatives, two aspects were taken into account: total initial cost and environmental impact. In the application of AHP, the main objective of the proposed hierarchy was the lowest environmental impact. Three possible causes were considered as the most important concerning environmental impact: dam and reservoir occupancy, dam collapse and transportation of wastes from the plant to the disposal site. Potential impacts on water, soil, fauna, flora and human occupation were analyzed. Costs were treated separately. Finally, a joint analysis of total initial costs and results from the AHP application was carried out in order to convey a support for the decision maker. A sensilibtily analysis was also performed to show the influence of one of the subcriteria on the final alternatives weights.

ASSUNTO(S)

tailing dams decisão decision barragem de rejeitos impacto ambiental environmental impact

Documentos Relacionados