Saturação de fluxos no sistema de transmissão em função da geração de potencia ativa

AUTOR(ES)
DATA DE PUBLICAÇÃO

1977

RESUMO

Upper bounded variables linear programming and piecewise linear programming algorithms have been prepared for application in some system planning aspects and for use in real power generation rescheduling related, if necessary, to load shedding or to the utilization of heat capacity of some transmission lines in order to get to a satisfactory operating condition.

ASSUNTO(S)

algoritmos - programação linear linhas de telecomunicação

Documentos Relacionados