Problemas multi-estagios de dimensionamento de lotes com tempo não-zero de produção e capacidade finita
AUTOR(ES)
Alistair Richard Clarck
DATA DE PUBLICAÇÃO
1990
RESUMO
Hulti-Stage Lot-Sizing Problems with Non-Zero Lead Time are formulated as Integer Programming models in a manner suitable for use with a rolling planning horizon in capacitated and uncapacitated Material Requirements Planning systems. Two solution approcehes, one of strong euts and another that uses Lagrangian Relaxation are developed. Computational results are reported and analysed for both approaches. In addition, a heuristic method for use in large-scale capacitated multi-stage systems with non-zero lead time is developed and tested
ASSUNTO(S)
engenharia eletrica programação orientada a objetos (computação)
ACESSO AO ARTIGO
http://libdigi.unicamp.br/document/?code=vtls000026801Documentos Relacionados
- Qualidade e estabilidade de heuristicas de dimensionamento de lotes para sistemas de produção multi-estagios
- Modelos matemáticos para problemas de dimensionamento de lotes com restrições de capacidade e custos de transporte
- Dimensionamento de lotes de multiplos itens com restrição de capacidade
- REPRESENTATION OF MULTISTAGE STOCHASTIC PROBLEMS IN DECOMPOSITION: AN APPLICATION IN PLANNING OF THE EXPANTION OF ELECTRIC POWER SYSTEMS
- Modelos e métodos de resolução para problemas integrados de dimensionamento de lotes de produção com decisões de distribuição e arranjo de carga