Estudo de viabilidade do sistema de ancoragem de uma unidade flutuante de produção e armazenamento \"FPSO\" acoplada a um sistema de completação seca \"TLWP\". / Mooring system feasibility study of a floating production and storage unit \"FPSO\" coupled to a dry tree system \"TLWP\".

AUTOR(ES)
FONTE

IBICT - Instituto Brasileiro de Informação em Ciência e Tecnologia

DATA DE PUBLICAÇÃO

29/03/2011

RESUMO

The oil and gas production in Brazilian fields are commonly found in deep water and situated far away from the coast, reaching distances of more than 100 km as, for example, in the Campos Basin or Santos Basin. Due to the heavy oil and lack of pipeline infrastructure found in these fields, not only subsea equipments that must support high pressure but also logistics problems such as supply chain and production exportation system play an important role for the offshore industry. A usual way to export the production is to concentrate it in hubs of submarine pipelines which flows the oil or gas from the platforms to the continent. This infrastructure makes possible the use of no storage production systems and, consequently, releases the use of the shuttle tanks employment. However, due to the quality of the oil and the distances between the wells and the coast, some Brazilian fields do not allow the use of the pipelines to export their production. For this reason, is quite common to use FPSO and semi-submersible aided by auxiliary systems such as the FSO (Floating Storage and Offloading) units. Another important and desired characteristic of production platforms is to make it feasible to install a dry Christmas tree system aiming to decrease, significantly, operational costs involved. This feature is performed, with excellence, by TLWP and Spar units due to the low level of motions and accelerations observed in these platforms. Harsh environmental conditions can bring difficulties to find a solution of a system with both storage and dry tree system capability. In this context, researchers and engineers are being forced to develop new technological systems capable to support this demand. In this way, a new solution considering a FPSO and a TLWP coupled in a short distance by synthetic ropes has being studied. Essentially, the attractive feature of this concept is the fact that the production is performed by the FPSO whereas the TLWP is responsible to support the risers and drilling facilities turning the system coupled, equipped with a dry Christmas tree and with the possibility to storage the production. By now, the concept evolution has been divided in three phases. The first phase concerned about an advanced research focusing on the connection and mooring system development and the hydrodynamic interaction between the units and having in mind the verification of the concept feasibility. The second phase, concerned about the results validation by a comparison with scale model tests performed in the NMRI (National Maritime Research Institute Japan). Finally, the third phase, has the focus in the mooring and connection system resizing based on the results obtained on second phase.

ASSUNTO(S)

análise dinâmica acoplada análise no domínio do tempo completação seca coupled system dry tree completion fpso-tlwp fpso-tlwp fully coupled analysis numerical offshore tank (tpn) sistema de produção acoplada tanque de provas numérico (tpn) time domain simulation

Documentos Relacionados