AVALIAÇÃO DO IMPACTO ECONÔMICO DE UM PROJETO DE PESQUISA E DESENVOLVIMENTO NO VALOR DE UMA PLANTA GAS-TO-LIQUIDS: USANDO A TEORIA DAS OPÇÕES REAIS / EVALUATION OF THE ECONOMIC IMPACT IN THE VALUE OF A GAS-TO-LIQUIDS FACILITY CAUSED BY A RESEARCH AND DEVELEOPMENT TECNOLOGICAL PROJECT: USING THE THE REAL OPTIONS THEORY

AUTOR(ES)
DATA DE PUBLICAÇÃO

2008

RESUMO

When making decisions, the figure of the manager comes across different types of uncertainties. Among them, the time to conclude a project. The characteristics of innovation and novelty in Research and Development Projects applied to technology, further reinforces the caution to be taken regarding the time dimension at the moment of the decision, since the penalty could culminate in the loss of a valuable business opportunity. In order to quantify the impact of the effort applied in a Research and Technological Development Project, in the value of an entrepreneurship conducted according to a context in which time is represented by a random variable, this study presents a pertinent model. Considering that a project sequentially evolves and can be abandoned during any stage of its development, the Theory of Real Options was the chosen theoretical framework. The model utilizes a lattice to capture the technical uncertainty, characteristics of the development of technology performance, and takes in account as a random variable the time of the conclusion of each stage of the project. The expected value of the project with the flexibility provided by the option to abandonment built in the Research and Development Project, is calculated through a combination of the Monte Carlo Simulation and the technique of Dynamic Programming. The proposed model was applied in the case of a Gas-to-liquid (GTL) plant. The payoff function of the Research and Development Project was built through several contributions stemmed from an agreement between the Industrial Engineering Department of PUC-RJ and Petrobras S.A., in order to assess the economic value of a GTL plant

ASSUNTO(S)

real options dynamic programming simulacao de monte carlo monte carlo simulation opcoes reais capital budgeting programacao dinamica avaliacao de projetos

Documentos Relacionados