A hybrid method for a Project Scheduling Problem
AUTOR(ES)
Silva, André Renato Villela da
FONTE
Pesqui. Oper.
DATA DE PUBLICAÇÃO
08/04/2014
RESUMO
This work deals with a project scheduling problem where the tasks consume resources to be activated, but start to produce them after that. This problem is known as Dynamic Resource-Constrained Project Scheduling Problem (DRCPSP). Three methods were proposed to divide the problem into smaller parts and solve them separately. Each partial solution is obtained by CPLEX optimizer and is used to generate more complete partial solutions. The obtained results show that this hybrid method works very well.
Documentos Relacionados
- DEVELOPMENT OF A HYBRID FUZZY GENETIC ALGORITHM MODEL FOR SOLVING TRANSPORTATION SCHEDULING PROBLEM
- A Stabilized Hybrid Discontinuous Galerkin Method for Nearly Incompressible Linear Elasticity Problem
- A NEW MATHEMATICAL MODEL FOR THE WORKOVER RIG SCHEDULING PROBLEM
- An efficient hybrid heuristic method for the 0-1 exact k-item quadratic knapsack problem
- PROJECT SCHEDULING OPTIMIZATION IN ELECTRICAL POWER UTILITIES