A NEW MATHEMATICAL MODEL FOR THE WORKOVER RIG SCHEDULING PROBLEM
AUTOR(ES)
Pérez, Miguel, Oliveira, Fabricio, Hamacher, Silvio
FONTE
Pesqui. Oper.
DATA DE PUBLICAÇÃO
2016-08
RESUMO
ABSTRACT One of the most important activities in the oil and gas industry is the intervention in wellsfor maintenance services, which is necessary to ensure the constant production of oil. These interventions are carried out by workover rigs. Thus, the Workover Rig Scheduling Problem (WRSP) consists of finding the best schedule to service the wells while considering the limited number of rigs with the objective of minimizing the total production loss. In this study, a 0-1 integer linear programming model capable of efficiently solving the WRSP with a homogeneous fleet of rigs is proposed. Computational experiments were carried out using instances based on real cases in Brazil to compare the results obtained by the proposed model with the results reported by other methods. The proposed model was capable of solving all instances considered in a reduced computational time, including the large instances for which only approximatesolutions were presently known.
Documentos Relacionados
- A NEW MATHEMATICAL MODEL FOR THE CUTTING STOCK/LEFTOVER PROBLEM
- Otimização do itinerario de sondas de intervenção
- DEVELOPMENT OF A HYBRID FUZZY GENETIC ALGORITHM MODEL FOR SOLVING TRANSPORTATION SCHEDULING PROBLEM
- A hybrid method for a Project Scheduling Problem
- A new mathematical model for fitting an HPL radioimmunoassay curve